10/20/2026
Rubber Duck Day!
This is the day we plug the newly installed drain fl**ge and hold water in the pan for 24 hours. We test the bonding fl**ge drain connection to the p trap first. Then we fill it up with 2 inches of water to test our membrane and bonding fl**ge connection on the shower pan.
Shout out to Avila Tile for the great prep work and installation you see here. It's good to know I have a team I can trust to handle these things while Lex and I wrap up some project planning for next year.