KWDG Architecture

KWDG Architecture Architecture, Design Build, Code Consulting, Entitlements, Design Review, Space Planning, Food Service Kitchen Design, Construction Documents, Exiting Plans

Construction job walk for Chilango Tacos @ Area 15. Grease duct welding. Plumbing and electrical rough in inspection pas...
01/09/2026

Construction job walk for Chilango Tacos @ Area 15. Grease duct welding. Plumbing and electrical rough in inspection passed.

Stopped by to pick up a pie and check out the place! Looks fantastic!!400 E. Serene Ave, Las Vegas
11/10/2025

Stopped by to pick up a pie and check out the place! Looks fantastic!!
400 E. Serene Ave, Las Vegas

Chilangos Tacos @ Area 15: Underground done. Waiting for revisions to be completd to submit to the building department a...
11/06/2025

Chilangos Tacos @ Area 15: Underground done. Waiting for revisions to be completd to submit to the building department and general contractor before proceeding.

XO Liquor on Paradise Road has interiors construction completed. Just waiting on shell building finals before they can m...
11/06/2025

XO Liquor on Paradise Road has interiors construction completed. Just waiting on shell building finals before they can move shelving and product in.

Chilango Tacos Construction done! Waiting on the sign company! đŸ˜¡
09/11/2025

Chilango Tacos Construction done! Waiting on the sign company! đŸ˜¡

Chilango’s Tacos construction kick off meeting. How often do you get to build a restaurant under a 747??
08/25/2025

Chilango’s Tacos construction kick off meeting. How often do you get to build a restaurant under a 747??

Prince Street Pizza construction is underway on Eastern & Serene.  Demolition done… pony walls built… time to close up t...
07/16/2025

Prince Street Pizza construction is underway on Eastern & Serene. Demolition done… pony walls built… time to close up the walls!!

The Taco Stand construction will wrap up this week on Ft. Apache & Charleston!
07/16/2025

The Taco Stand construction will wrap up this week on Ft. Apache & Charleston!

Chilangos Tacos construction is looking great!!
07/16/2025

Chilangos Tacos construction is looking great!!

XO Liquor endcap Tenant Improvements are being built simultaneously with the Shell on Flamingo & Paradise.
07/16/2025

XO Liquor endcap Tenant Improvements are being built simultaneously with the Shell on Flamingo & Paradise.

Chilango’s Tacos in Grand Bazaar Shops on the Las Vegas Strip. HVAC layout in a very tight space!! But weve figured it o...
04/21/2025

Chilango’s Tacos in Grand Bazaar Shops on the Las Vegas Strip. HVAC layout in a very tight space!! But weve figured it out!!

Loaded Empanadas in Boca Park is Open! Come check out this cool Cuban vibe!!
04/21/2025

Loaded Empanadas in Boca Park is Open! Come check out this cool Cuban vibe!!

Address

Las Vegas, NV

Alerts

Be the first to know and let us send you an email when KWDG Architecture posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KWDG Architecture:

Share