03/09/2026
Check out this trailer parking pad we wrapped up last week.
We cut all the top soil off the top and prepped the area for rock, by far the most important part when install pads or driveways.
After excavation we installed a solid base using 3”- rock placed in lifts and compacted. Topping it all of with a layer of 3/4”-compacted.
Compaction is very important when installing gravel pads and driveways, it keeps the desired grade in place and locks in the entire area into one unit and will identity soft/low spots to be fixed before leaving site. Ensuring a product that will last a long time and not develop ruts.
Big shout out to Colton Stepp Trucking on the rock hauling ( almost 70 Tons 🤯) and Elite Equipment Rental for coming in on super short notice for a skid loader when ours broke a track.
If you have a project that needs a solution, give us a call today
541-974-4002
Licensed,Bonded, and Insured
CCB 255006
Based out of Lebanon, Oregon and serving Oregon statewide.