02/06/2026
Updated shower remodel.. this client had a leak behind the wall & the original shower had to be demolished, the basement cinderblock wall had to be repaired, then it had to be rebuilt.. they gave me free range to design but to match existing vanity/sink (i’ll post more pix in comments).. my first time working with 24”x48” tiles.. the end result is beautiful!
*I still have to install the new toilet next week..
*the only help I had was removing & reinstalling the glass doors..they’re very heavy & fragile.. & it took 2 people to handle.