Mrh construction

Mrh construction I love meeting with people and working with them on whatever problems they may have. My favorite par

Building a bathroom from scratch
05/22/2026

Building a bathroom from scratch

05/06/2026

Just finished

Before and after pics of the basement. I tore out all galvanized water pipes and replaced all of them with pex. Installe...
05/06/2026

Before and after pics of the basement. I tore out all galvanized water pipes and replaced all of them with pex. Installed a new breaker box ran all new wiring Installed outlet boxs light boxes and light switches framed all of walls, sheetrocked it mudded in sanded and painted the walls the customer is a artist and hand painted all the flowers which turned out really really good. Ps don't ask me to paint flowers on the walls i know someone who is a really really good artist, best u will get from me in the artist department is stick figures

05/06/2026
05/06/2026

Finished the basement job finally it was just uneven concrete and cinder block walls when I started it took 48 bags of concrete to get it so I could install the flooring it ran all new waterlines. I installed a new breaker box and ran 400 ft of romex

Pictures of jobs ive finished lately or are currently working on
03/29/2026

Pictures of jobs ive finished lately or are currently working on

Finished kitchen yesterday it turned out beautiful
01/29/2026

Finished kitchen yesterday it turned out beautiful

Just barely finished this bathroom
01/04/2026

Just barely finished this bathroom

The before and after pics of this job is going to be i believe my best ever redo
11/03/2025

The before and after pics of this job is going to be i believe my best ever redo

I installed all new windows and fixed the front door, installed the siding and installed all new outside lights.  This h...
11/03/2025

I installed all new windows and fixed the front door, installed the siding and installed all new outside lights. This house should have been condemned. The front walls were 4 inches out of level ceiling joists had fallen down because the tops of the walls had moved out so far the joists and ceiling caved in back walls were 6 inches out of level. We pulled em all in with 4 comalongs

Address

Maysville, MO
64469

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Telephone

+18163907100

Alerts

Be the first to know and let us send you an email when Mrh construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Mrh construction:

Share