06/05/2026
“Can you get our project done in around 4 weeks?”
Sure… it was 2,000 sq ft of glue down wood demo, leveling the entire area, installing new wood flooring, patching a flooded laundry room and reinstalling wainscoting, new cement board, tile, vanities, and mirrors in a half bath and three other bathrooms, two new showers over tubs, a complete gut out of a master area with new tub and shower configurations, new door conversions, and misc Sheetrock, trim, and painting final touches with new fixtures. Deadline met. Anything else?! 😅