10/28/2026
This project involved a challenging utility conflict where a third-party fiber optic boring crew punched directly through the existing sewer main. Managing multiple active underground utilities in tight excavation spaces requires extreme caution, meticulous hand-digging, and precise alignment to ensure structural integrity and correct grade.
Our team safely exposed the crossing utilities, isolated the damaged section, and executed a professional pipe repair using schedule-40 PVC and heavy-duty shielded couplings to permanently restore reliable flow.
When complex excavation and utility interference threaten your sewer infrastructure, trust master plumbing professionals to get the job done right.
Contact Direct Line Plumbing Drain Gas & Water LLC at 205-470-9566