Bill's Home Repair WV

Bill's Home Repair WV Offering home repairs, maintenance, painting, and remodeling.

New plywood is put down on the floor. Two coats of primer applied to the plywood. Eight bags of floor leveler mixed and ...
06/02/2026

New plywood is put down on the floor. Two coats of primer applied to the plywood. Eight bags of floor leveler mixed and poured on top for a nice flat subfloor.

Considering the state of the floor when I started this job, I'm extremely happy with how plumb and level the furnace cam...
05/29/2026

Considering the state of the floor when I started this job, I'm extremely happy with how plumb and level the furnace came out. It may not be perfectly plumb, but it's between the lines!!!

The furnace is sitting back down on 3/4" solid wood. All the cribbing was removed. Furnace and floor are solid and no mo...
05/22/2026

The furnace is sitting back down on 3/4" solid wood. All the cribbing was removed. Furnace and floor are solid and no more movement!!!

05/22/2026

The floor behind the furnace is all braced and supported. Short video shows the floor no longer moves. Yeah!!

05/21/2026

One step forward, two steps back. The flooring behind the furnace is giving out. Short video shows the floor moving behind the furnace.

Semi emergency water heater replacement. Old one quit working after about 12 years. I had to replace a section of the pl...
05/16/2026

Semi emergency water heater replacement. Old one quit working after about 12 years. I had to replace a section of the plumbing. It had some strange compression coupling I could not find parts to fix.

Jacked up the furnace and supported it with cribbing. Dug out all the rotten floor form under the furnace. All cleaned u...
05/08/2026

Jacked up the furnace and supported it with cribbing. Dug out all the rotten floor form under the furnace. All cleaned up and ready for new subfloor.

Now that the gas line is relocated I'm reinforcing the old floor joist that was damaged and sagging. I installed a doubl...
05/06/2026

Now that the gas line is relocated I'm reinforcing the old floor joist that was damaged and sagging. I installed a double 2x10 across the floor joist to strengthen the floor and hold the weight of the water heater. All boards were joined with structural adhesive and 1/2" bolts every 16", as well as hangers and structural screws.

One problem taken care of. I had to have the HVAC company come out and relocate the gas line. Someone literally dug half...
05/04/2026

One problem taken care of. I had to have the HVAC company come out and relocate the gas line. Someone literally dug half the floor joist out when they put the original gas line in. Five inches of the joist was all that was left to carry the weight. That beam was sagging and needs re-supported.

Demo is mostly complete. Water heater is out, subfloor is removed and the last sheetrock is removed. Now I have to find ...
04/29/2026

Demo is mostly complete. Water heater is out, subfloor is removed and the last sheetrock is removed. Now I have to find a way of fixing the water damage. Floor has sagged down a substantial amount.

Address

Moorefield, WV
26836

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

(304) 434-2312

Website

Alerts

Be the first to know and let us send you an email when Bill's Home Repair WV posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share