Custom cabinets, casework furniture, shelves, carpentry, trim, stone and ceramic tile, built-ins, floors, interiors, exteriors, remodels, framing, soundproofing, bathrooms, kitchens, finishes, details.

A few details of the completed whole house remodel in Wondervu.
08/09/2024

A few details of the completed whole house remodel in Wondervu.

Updates on an old (1980s) house:
07/04/2024

Updates on an old (1980s) house:

Wrapping up this fireplace surround / entertainment center.  TV mount will go in the recess and flatscreen tv will cover...
02/27/2024

Wrapping up this fireplace surround / entertainment center. TV mount will go in the recess and flatscreen tv will cover the recess. Side cabinets for storage, floating shelves for display, mini split for heat and ac.

Taos progress:  Exterior walls, roof rafters, interior partitions.
05/29/2022

Taos progress: Exterior walls, roof rafters, interior partitions.

Taos progress: More walls up yesterday.
05/20/2022

Taos progress: More walls up yesterday.

Taos progress: floor, walls.  Sunshine, no rain, wildfires still burning to the east.
05/18/2022

Taos progress: floor, walls. Sunshine, no rain, wildfires still burning to the east.

New build, Taos NM.  1st week progress.  Extreme gusty winds making work difficult.  Wildfires burning just to the east.
05/11/2022

New build, Taos NM. 1st week progress. Extreme gusty winds making work difficult. Wildfires burning just to the east.

Napa ADU project:  Door and window trim, attic access trim, range hood installed.
05/02/2022

Napa ADU project: Door and window trim, attic access trim, range hood installed.

ADU design  build project, Napa CA.  Drywall inspection passed, texture, paint, kitchenette cabinets installed.  Vented ...
04/29/2022

ADU design build project, Napa CA. Drywall inspection passed, texture, paint, kitchenette cabinets installed. Vented range hood, door and window trim next.

ADU design/build project. Napa CA.Passed framing, plumbing, electrical, and insulation inspections.  Drywall inspection ...
04/14/2022

ADU design/build project. Napa CA.
Passed framing, plumbing, electrical, and insulation inspections. Drywall inspection next.

Remove large window, replace with smaller window,  weave in new siding boards, trim out.
01/10/2022

Remove large window, replace with smaller window, weave in new siding boards, trim out.

Wrapping up a bathroom remodel in a post and beam.  Tile floor and tub surround, custom storage cabinet, new electrical,...
05/27/2021

Wrapping up a bathroom remodel in a post and beam. Tile floor and tub surround, custom storage cabinet, new electrical, vanity from Wayfair with granite from local supplier.

Address

Box 3056
Nederland, CO
80466

Alerts

Be the first to know and let us send you an email when Williams Design & Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Williams Design & Construction:

Share