10/19/2026
Another week down, and two more Valve Yards are officially complete! 🛠️💼
The crew absolutely knocked these out of the park.
We installed a robust 8’ tall, 2" mesh, 9-gauge chain link fence topped with an additional 1’ of three-strand barbed wire for maximum security.
To ensure these yards stand the test of time, we built them using ultra-durable SF40 weight piping and framework. For functionality, we integrated high-quality Panic Bar Gates alongside 12’ double-drive gates, providing smooth truck access for crews needing to pig the lines and maintain the matte valves.
These projects were far from a walk in the park. The team faced tough, high-stakes conditions that required ultimate precision:
• Meticulous Hand-Digging: Because we were working directly over live gas lines entering and leaving the yard—plus parallel water lines—every single post hole had to be safely dug by hand.
• Pure Muscle Power: With zero access for the EZ Mud Hog, every single bag of 4000 PSI concrete had to be hand-mixed in wheelbarrows. Why? Because we NEVER dry pack our posts! 💯🔥
No matter how tough the site conditions get, our guys always find a way to adapt, push through, and deliver a premium product ahead of schedule and right on budget.
Huge shoutout to the hardest-working crew in the business! 🙌 💪