04/02/2026
Little update on the project. Walls and ceilings painted, sub-floor and lots of leveler install(old house lots of settling), cabinets boxes and panels are in, ready for trim. Electrician is doing trim out.Stain work happening, master shower getting prepped for stone templating. Old School Shower Pan, dry pack mortar and curb with NO wood inside it.Sorry for messy photos we are living on site during this remodelđŸ˜¬