11/03/2026
When a remodel list includes two rooms, the order you tackle them in matters more than most people expect.
If the kitchen and a bathroom are both on your list, here is how we usually think it through with homeowners:
- Start with the room that is failing hardest. If the kitchen truly is not working for your family, it earns the first slot. If the main bath is the daily frustration, start there. The room you use most should not wait behind the room you use less.
- Consider doing the smaller room first. A powder room or guest bath is a shorter project, and it lets you experience how the process runs: decisions, schedules, dust, crews in the house, before committing to the big one.
- Understand the calendar reality. The kitchen is usually the longest and most involved project in the house. Doing it first means the disruption happens once, up front, while the rest of the home stays intact.
- Never start both at once. Two rooms under construction in a lived-in home means no working kitchen and no working bathroom at the same time. Sequencing keeps one of each in service almost the whole way through.
- Spread the decisions. Each room carries its own choices in finishes, fixtures, and materials. Staggering the projects keeps the decision load manageable instead of stacking every selection into one month.
There is no single right answer, but there is a right answer for your household, your budget, and your tolerance for dust. That conversation is worth having before either project starts.
Luther Falls Kitchen and Bath of Normal has been remodeling kitchens and baths for 72 years. Bring us the whole list and we will help you find the order that works.