06/10/2023
This is a bathroom we remodeled a couple months ago. As the tear out progressed we found 3 layers of ceiling and walls. Floor was built up over a concrete slab with 2 x 4. This also has 2 layers. Stripped room completely out and even had to replace 80% of framing. Concrete was cut out and plumbing was corrected to code and placed into slab. New concrete and leveling compound installed. New electrical and a super quite vent fan with light installed. Walls were sealed with insulation board and foam then Fiberglass insulation. Moisture resistant drywall installed. Primed and Finish Painted. Tile Floors and a Tiled wall Shower Installed. Baseboard heat installed. New Vanity, Kohler Toilet and Door Installed. Now a beautiful Bathroom that you don't have to step up to use!