JMP Property services

03/20/2025
Section of bunk floor we re poured, along with a new apron to an old hay barn
01/22/2024

Section of bunk floor we re poured, along with a new apron to an old hay barn

Patio that we poured at the end of the summer, it was stamped with a field stone stamp with charcoal release and then se...
01/22/2024

Patio that we poured at the end of the summer, it was stamped with a field stone stamp with charcoal release and then sealed.

Fixed the roof around this silo a couple months back, was a very challenging job
01/22/2024

Fixed the roof around this silo a couple months back, was a very challenging job

This remodel we just finished up last week. Demoed the old plaster and lathe and hung new Sheetrock, and installed new t...
01/22/2024

This remodel we just finished up last week. Demoed the old plaster and lathe and hung new Sheetrock, and installed new trim. We also replaced the stair treads and spindles on the main stair case. An accent wall was added to the master bedroom as well. It was a lot of work but a fun project

Here’s a job we finished up a couple months ago, 1300sqft basement we framed and finished. Included a great room, wet ba...
01/22/2024

Here’s a job we finished up a couple months ago, 1300sqft basement we framed and finished. Included a great room, wet bar, bathroom, master bedroom, office and living room. tools

Finished up this nice stampcrete sidewalk today. No color added to the concrete just charcoal release thrown on top made...
08/04/2023

Finished up this nice stampcrete sidewalk today. No color added to the concrete just charcoal release thrown on top made to match the existing sidewalk.

I have really been slacking on posting jobs that we have finished lately, here we demoed tile floors in a kitchen, half ...
04/20/2023

I have really been slacking on posting jobs that we have finished lately, here we demoed tile floors in a kitchen, half bath, laundry room and mud room. Then LVT plank flooring was installed. Changed the whole look of the areas.

Heres another LVT flooring job we did in a master bedroom for a family friend.
04/20/2023

Heres another LVT flooring job we did in a master bedroom for a family friend.

This job we turned attic space above a garage into living space. We had to build stairs to access the room, insulate. A ...
04/20/2023

This job we turned attic space above a garage into living space. We had to build stairs to access the room, insulate. A closet was framed, sheet roach was hung then finished. The homeowners were very happy with the way that the room turned out.

Small job where we removed a couple windows and a sliding door. The windows we took out were put in place of the sliding...
04/20/2023

Small job where we removed a couple windows and a sliding door. The windows we took out were put in place of the sliding door and a new window was installed in one of the window openings that was in a bathroom. We still have to go back and piece the siding back in around the windows once the homeowner gets it.

These are two different houses we did a little work at. The first one we removed a door framed the opening, insulated, a...
04/20/2023

These are two different houses we did a little work at. The first one we removed a door framed the opening, insulated, and Hung Sheetrock on the interior of the wall. We then had to piece the siding back in on the outside to match the existing. The second one we removed two old rotted wood windows and replaced them with new vinyl windows. We also had to install all new trim on the inside.

Address

Owasco, NY
13021

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when JMP Property services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JMP Property services:

Share