03/27/2021
Alright now on to favorite remodel, the kitchen. There was originally a coat closet that was removed to open up the space. I also shortened the pantry for the same reason. I removed the old laminate flooring, patched and texture drywall hole and prepped for the cabinets. I framed the island and installed the cabinets. The counters were
done by , W***y does awesome work. The floor is rich cream lvp with 5 1/2 inch baseboard. The backslash is 3 x 6 inch subway tile with blackgrout and a schluter strip cap.