08/03/2022
The 2nd bathroom included removing the fiberglass insert, widening the shower area as much as possible, installing 3x6 subway tile for the shower walls, penny round tile for the shower floor and throughout the rest of the bathroom, new paint for the walls, ceiling, and vanity, and installation of the new shower door.