12/05/2024
Everyone loves before and afters! Taking you back in time to this job that was done in October 2023 for this existing addition interior finish-out! Let me break down exactly what M4 did with this project:
Slides 1 and 2: Electrical rough-in, insulation, drywall, tape/texture, paint, stain and sealer over wood headed into bedroom.
Slides 3 and 4: Insulation, drywall, tape/texture, paint, and window weather-proofing down stair well corridor.
Slides 5 and 6: Self-Leveling concrete subfloor, followed with a tile floor install. Additional weather proofing sealer installed around all windows.
Slides 7 and 8: Interior and exterior door install with finish/trim out and enveloping existing addition that was not properly finished out.
Call or email us today for a quote on any projects you need done!
📞 817-995-4409
📧 [email protected]