07/04/2026
⚡ Big upgrades start below the surface.
For this San Mateo project, we prepared the site for a new 400-amp electrical service by trenching from the street, installing underground conduit, building reinforced concrete footings and a new equipment pad, and coordinating every step to ensure a smooth installation.
From excavation to the finished foundation, every detail mattered. It’s work most people never see—but it’s what powers everything that comes next.
Another quality project completed by MP Construction. Built right from the ground up.