08/14/2024
Another condo bathroom remodel complete. It's like riding a bike now. Ran into some issues with shower pan height clearing the drain exhaust. Poured a new pad with lelf leveler to remedy the issue. New mixing valve installation, with access panel installed, drain piping is 2" now. Old pump for whirlpool bath tub removed. And circuit properly terminated. Ceiling and walls priming and painting, afterwards caulking where walls and baseboards meet with dap 230. Also painting of baseboards and all trim white.
Solving the transition from the new shower ( 30")to the existing tile was interesting to say the least. The previous bathtub shower was (32").
All old gold finished fixtures were removed throughout bathroom. Then replaced with brushed nickel fixtures ( faucet, towel hanger, hand towel hanger, light fixture over sink and TP holder).
Great customers also.