08/21/2026
Ocean project is moving along. The balcony pad foundations and Grade beam have been poured. Steel columns are in and the balcony is completely framed. Rough framing, electrical, and plumbing are coming to the end. Wrapping the exterior with a product called VP 100, by Henry’s. It’s not only a Weather barrier, but also an air barrier and is a peal and stick. Copper flashing going in for both patio slider door pans, deck flashing, saddle flashing, and drip edge flashing. SLH Builders R Johnston Interiors