09/10/2026
Before the drywall went up, we completed the subfloor framing, insulation, electrical, and plumbing. We weren’t able to capture much of that work on video, but by this point everything behind the walls was taken care of and the drywall was hung.
The next stage was taping and mudding the walls and ceilings for a Level 4 smooth finish.
Stay tuned as we continue sharing the progress all the way through the finished project!