This project is all completed except the shower valve and head. It will be installed in the morning. (The supplier forgo...
06/10/2026

This project is all completed except the shower valve and head. It will be installed in the morning. (The supplier forgot to ship it).

Board's all up. Ready for tile tomorrow.
06/02/2026

Board's all up. Ready for tile tomorrow.

Well today Dad cut a piece of 5/8" plywood for under the new shower base.   Then he installed most of the vertical shipl...
05/29/2026

Well today Dad cut a piece of 5/8" plywood for under the new shower base.
Then he installed most of the vertical shiplap on the walls.
Plumber comes tomorrow. Then Ed will work on the tile on Monday & Tuesday. Once the tile is completed. Dad can finish trimming it out and hang the med cabinet & mirror. As well as complete the electrical.

Day two on this bathroom remodel.   Dad pulled the toilet and removed the old drywall around the shower (exposing the pl...
05/28/2026

Day two on this bathroom remodel.
Dad pulled the toilet and removed the old drywall around the shower (exposing the plumbing for the plumber to redo on Saturday).
He also rerouted the wiring for the light over the new medicine cabinet. And cut out the ceiling to put in the new exhaust fan. He had to climb up in the attic to run 20 ft. Of vent tube up to the gable vent. (The old exhaust fan literally just dumped into the insulation with no exterior vent).
Then he installed the fluted shiplap on the ceiling. And prepped the walls for the vertical materials being installed tomorrow.

OK!  Besides a little bit of paint touch up we are done with this porch.  The flooring guys were out to look over the jo...
05/26/2026

OK!
Besides a little bit of paint touch up we are done with this porch.
The flooring guys were out to look over the job while we were out to lunch and picking up more paint. I told him to get us on their schedual.
The pictures today are of before Dad started this morning and after he finished up.

We are so close!Just a bit of painting left for Mia to do.Dad installed the rest of the trim inside of the porch. Then h...
05/22/2026

We are so close!
Just a bit of painting left for Mia to do.
Dad installed the rest of the trim inside of the porch. Then he removed the coach lights on the front (to be reinstalled later). And he stretched and fastened all of the screens. It is ready for the panels and cedar to be installed on the outside.@

Today we made some good progress on the screenen in porch that we are refurbishing.  Mia got most of the painting done. ...
05/21/2026

Today we made some good progress on the screenen in porch that we are refurbishing.
Mia got most of the painting done. It is taking her longer as she had to wash down everything befor she could paint. And it's just bad enough that she is having to do two coats as well. But it is looking nice and clean!
Dad first worked at running wires. Then he installed the new ceiling ( V-groove barn siding). He also installed two new switches and the 5 new LED pancake lights. And he started running the 1 x 6 band around the inside of the room. Then he will add a quarter round to finish it off.

Mia filled nail holes and painted the half wall, at the top of the stairs, today. Looks nice. Check that off of our list...
05/20/2026

Mia filled nail holes and painted the half wall, at the top of the stairs, today. Looks nice. Check that off of our list.
Dad cut and installed the treated 2x4's to support the walls that are going around the porch. And he cut the blocking that goes above to attach the screen too.
He also spent a bunch of time trying to figure out where all of the wiring goes and what it is supposed to do. Tomorrow he will run the wiring for the pancake lights that we will be installing in the ceiling.
Mia also finished her day painting on the porch.

We started this multi front project today. Follow and you will see the progress.  Today to start Dad worked to add verti...
05/19/2026

We started this multi front project today. Follow and you will see the progress.
Today to start Dad worked to add vertical shiplap on the knee wall along the top of the stairs. This ties it in with the looks on the landing.
Mean while Mia was outside cleaning up what once was a screened in porch area.
The goal is to return it to it's former glory as a screened porch. But in a 2.0 fasion.

We would have finished this project today but the suppliergave us 42" stair rails instead of the 36" ones.  Other than t...
05/15/2026

We would have finished this project today but the suppliergave us 42" stair rails instead of the 36" ones.
Other than that we have it done.

Address

Seville, OH

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5am
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+13303276389

Alerts

Be the first to know and let us send you an email when Building with Carpenter Aunts LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Building with Carpenter Aunts LTD:

Share