10/31/2026
Didn't post end of day photos yesterday, so here they are.
Moving along with the fascia, rake trim went up towards the end of the day. I had to zip off early to get to Erie Building Supplies to pick up more J-Channel, order another 6 boxes of siding ( downside to the shakers cuts are hard to use in other places) oh well, paid for and be on site Tuesday. Maybe 200sqft of siding left to put up.
Goal Monday is to finish metal fascia and rake, then Tuesday, we can flash around slider ( just got that today) do F&J-Channel on slider wall. I really think friday will be the wrap up day until the 2oth of November when the door arrives, then its half a day of siding.
Working on materials list to get the interior put back and livable, new insulation, sheetrock, casings, door and window trim and base molding, and see uf we can get the flooring i pulled up, back down. Shouldn't be a problem, was very gentle when pulling it, stacked it nice and out of the way, just gotta flip the stack over and start from the bottom.
I know the homeowners will be happy to get out of the rental guest cottage and into their freshly renovated house. I would be to.
Plumbing I done, they have water and a working toilet now! Electrical should be ready for inspector after monday as Sam is going to work on finishing that monday.