Koehler Custom Framing LLC

Koehler Custom Framing LLC All phases of residential construction and home renovations with over 16 years of experience.

Owner operated, Located out of Sidney NY serving Delaware, Chenango & Otsego Counties.

Another one in the books. Laborer is coming back after lunch to finish cleaning up and grade out the remaining dirt. As ...
06/05/2026

Another one in the books. Laborer is coming back after lunch to finish cleaning up and grade out the remaining dirt.
As for me, im home on my heating pad lol going to chill and relax this weekend, because Monday back to the grind. The next one is fire escape deck/stairway for 2nd floor unit, again with The House Doctor. That should be fun times lol.

Passed framing inspection this morning, banged out the decking before lunch. Came back got the 1st 4 posts cut so we cou...
06/04/2026

Passed framing inspection this morning, banged out the decking before lunch. Came back got the 1st 4 posts cut so we could get the railings up. Tomorrow finish the posts and railing and the stairs and be done. Quick turn around on this 10x14 deck. On to the next one.

Little deck action with "The House Doctor" & Koehler Custom Framing. 10x14 from the ground up. Got our corner posts set ...
06/03/2026

Little deck action with "The House Doctor" & Koehler Custom Framing. 10x14 from the ground up. Got our corner posts set yesterday, finished them today and banged out the frame work after lunch. Tomorrow, 2x6 decking & stair stringers. Friday should have the railings done and wrapped up.
Met the Code Enforcement officer for the town of Sidney finally, he is spoken highly of. Im sure ill be seeing him a lot more lol.

Roof job is done, also banged out the other little things, some flashing on tool shed etc. I did get the lattice back up...
05/27/2026

Roof job is done, also banged out the other little things, some flashing on tool shed etc. I did get the lattice back up under the deck, just didnt snap a photo of it back up and cut tubes away.
Job is complete, on to the next one.

Today was a pain, the wind kicking up while trying to roll out the snow & ice shield, got tir3d of battling 20ft section...
05/20/2026

Today was a pain, the wind kicking up while trying to roll out the snow & ice shield, got tir3d of battling 20ft sections so I cut em in half, problem solved. Got a little wet for a min lol. Have to pick up some more perlings in the am as well as a high temp heat shield boot so it can get it done by end of day Friday.
Hips are killing me, dang fluctuations in the weather is kicking my but. Mon-Tue was hot and muggy, today windy, rain on and off and in 60s.

Got the metal up on the outdoor cat area and finished the roofing sheets. Due to breaker issue i had to hand nail the 2n...
05/19/2026

Got the metal up on the outdoor cat area and finished the roofing sheets. Due to breaker issue i had to hand nail the 2nd half of the roof and lemme tell you, it was 85° and humid, got out the truck and 5 mins later, I was soaked.
Anyways, delivery tomorrow, get the snow & ice shield up 1st thing and step flashing, then work on perlings etc. I really hope it doesnt decide to rain tonight before I get roof covered.

Couple more sheets of plywood to do tomorrow. Wednesday all my metal and materials arrives by 8am, so I can get the drip...
05/18/2026

Couple more sheets of plywood to do tomorrow. Wednesday all my metal and materials arrives by 8am, so I can get the drip edge up and snow & ice shield on and perlings. Tomorrow, also picking up roofing for cat house, so that'll get some metal roofing to match the covered decks roof. Deck is getting painted i was informed today. Id stain it personally but costs is the factor.
Hit 90° today, I got a nice lobster tan bahahaha.

Rafters are up, hardware installed. Monday, blocking, facia, shear, snow & ice shield and perlings. I could've done bloc...
05/15/2026

Rafters are up, hardware installed. Monday, blocking, facia, shear, snow & ice shield and perlings. I could've done blocking today, but I am beat. All week its just been me, jigged all the rafters, cut em and put them up between yesterday and today, in between the rain.
I Was able to get to Alpine Roofing this afternoon to get the metal and accessories ordered. Should be on site by Wednesday of upcoming week, which means by end of next week roof should be completed.
Ready for the weekend for sure.

Address

2 DeForest Lane
Sidney, NY
13838

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Koehler Custom Framing LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share