ASAP Handyman

ASAP Handyman Home repairs of all types. minor plumbing to roof repairs. gutter cleaning. no job too small

08/04/2025

Now doing toilet rebuilds, garbage disposals, faucet replacements, shut off valves, gas or electric hot water heater replacement. Contact for pricing.

12/20/2023

Winterize your home now before its too late.

12/20/2023

Maintain
Everything must be maintained in order to be kept.

12/20/2023

Insanity is often described as doing the same thing over and over expecting different results.

12/20/2023

Don't be a slum lord. Do it right. It may cost a little more but you will have to repeat less often.

12/20/2023

In a world of cheap construction ethics quality work is the road less traveled.

12/20/2023

Do it right the first time and it will cost less in the future.

12/20/2023

When quality remains the high price of it is forgotten.

12/20/2023

ESTIMATES ARE EXACTLY WHAT THE WORD IMPLIES.
Oxford languages dictionary gives the following definition
es•ti•mate
Verb
1) roughly calculate or judge the value, number, quantity, or extent of.

A estimate may be more or less than the written/verbal estimate. A estimate is not a proposal in which the final price is determined. A estimate is not a invoice in which is the actual cost of the project once completed. A estimate is a general idea of how much the project could cost. NOT A ACTUAL COST OF THE PROJECT.

12/20/2023

Understanding the change order.
A change order is placed when something that is unforseen is discovered. If I give you a estimate for a project and upon starting the project. Something changes that requires a change order. A change order usually means the projects price will increase.
A example of this would be. You hire me to repair a window that is not working properly. Upon removing the trim to repair the window. Termite damage is discovered. This will require a change order.
This means another estimate will have to be done in order to complete the job. The estimate will have to approved by you. Before the work can be started. This happens MOST OF THE TIME when dealing with old homes or if some one else has tried to fix the problem and did not do it correctly.
A change order must be done before the original job can be completed in most cases. Sometimes when a change order is placed another professional will have to come in to repair necessary components of the project. This will require a bid or estimate from that professional.

12/20/2023

Starting January 1st I will be using select jobs to do documentaries on my jobs. The jobs will be posted on this page in varied steps. Follow to get the latest post.

Address

St. Louis, MO

Telephone

+17068097650

Website

Alerts

Be the first to know and let us send you an email when ASAP Handyman posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ASAP Handyman:

Share