Every custom home starts below grade.
Today marks a major milestone at Clinton as we pour the footings—the foundation that everything else will be built upon.
A pour of this size takes more than concrete. It takes planning, coordination, and precise timing.
Today, 100 cubic yards of concrete are. being poured, with ready-mix trucks arriving every 15 minutes to keep
the boom pump running without interruption.
Behind the scenes, days of rebar installation, layout, and preparation have led to this moment.
The conditions couldn't be better. A little extra humidity helps the concrete cure more evenly, setting the stage for a strong foundation.
Once these footings are complete, we'll begin forming the stem walls and watch the Clinton project start to come out of the ground.Every exceptional home starts with a solid foundation.
Clinton | Paradise Valley, Arizona