Invested Home Renovations

Invested Home Renovations SPECIALIZING IN CUSTOM DESIGNED FINISHED BASEMENTS. Call now to schedule a free estimate.

ALSO KITCHENS, BATHROOMS, CABINETS, COUNTERTOPS, DOORS & TRIM, FLOORING, TILE, FRAMING, DRYWALL, PAINT, & STAIRCASES.
• FREE ESTIMATES
• 3-D RENDERINGS
• FULLY INSURED INVESTED HOME RENOVATIONS specializes in basements, bathrooms, cabinets, doors & trim, flooring, fireplaces, kitchens, staircases & more.

🔥Our 800 ft.² Wentzville basement is framed & fire blocked. Rough electric, HVAC, and plumbing is installed. Inspection...
02/10/2026

🔥Our 800 ft.² Wentzville basement is framed & fire blocked. Rough electric, HVAC, and plumbing is installed. Inspection is tomorrow morning, we hang drywall Saturday.

🌐 Investedhomerenovations.com


We installed over 4,000 ft.² of Mannington vinyl plank over three levels in this massive seven bedroom, seven bathroom 6...
01/23/2026

We installed over 4,000 ft.² of Mannington vinyl plank over three levels in this massive seven bedroom, seven bathroom 6,500 square-foot hunting lodge in Bowling Green Missouri. 

Putting the final touches on this custom designed finished basement. 💥Floor plan includes:• Bedroom w/hand stained close...
01/16/2026

Putting the final touches on this custom designed finished basement. 💥

Floor plan includes:
• Bedroom w/hand stained closet shelf ✔️
• Bathroom w/tile shower, hand stained closet shelves & double bowl vanity ✔️
• Office ✔️
• Hand stained solid core doors &
baseboard ✔️
• Unfinished storage room w/bookshelf murphy door access ✔️
• Large format ceramic tile throughout ✔️

❗️❗️If you’re looking to add finished space to your basement, remodel your kitchen or bathroom, give us a call📞 text 📱or email 📧

Kitchen remodel we banged out this year. Full gut. We removed 3 windows, all cabinets, countertops, flooring & baseboard...
12/31/2025

Kitchen remodel we banged out this year.
Full gut. We removed 3 windows, all cabinets, countertops, flooring & baseboards.
Made some changes to the kitchen floorplan. Relocated refrigerator & stove. Painted main level, added new siding where windows were replaced, new cabinets, countertops, flooring, fixtures & faucet.

Nice finished basement we completed this year. Two bedrooms, bathroom with tile shower, office, open living area, wet ba...
12/31/2025

Nice finished basement we completed this year. Two bedrooms, bathroom with tile shower, office, open living area, wet bar with peninsula & unfinished storage.

Awesome finished basement we completed this year. Solid core doors, board & batten, crown molding, custom tile shower, s...
12/31/2025

Awesome finished basement we completed this year. Solid core doors, board & batten, crown molding, custom tile shower, stand alone tub, marble floor, bedroom, bathroom, cedar closet this basement is stacked with upgrades.

Final pictures of the new build. Very happy for the homeowners & appreciate the opportunity & experience. 3,200 ft.² of ...
12/31/2025

Final pictures of the new build.
Very happy for the homeowners & appreciate the opportunity & experience.

3,200 ft.² of finished space, four bedrooms, four full bathrooms, two full kitchens, custom tile showers, safe room under the front porch,
12‘ x 12‘ covered composite deck, fully finished walkout basement with added windows and 9 foot ceilings, rails & spindles, four car oversized garage, concrete everywhere, upgraded shingles and insulation, 4 ton heating and cooling system with dual zoning smart thermostats this thing is a beast.

Thank you to all the veterans that served to protect our freedom.🫡 🇺🇸
11/11/2025

Thank you to all the veterans that served to protect our freedom.🫡 🇺🇸

Getting wired up with LVG Electrical & Communications. Deck boards & rails are in. Main level stair wall finished up.
07/29/2025

Getting wired up with LVG Electrical & Communications. Deck boards & rails are in.
Main level stair wall finished up.

Been a busy couple weeks. Shingles are on, grading & gravel, underground rough plumbing. Basement & garage concrete pour...
07/12/2025

Been a busy couple weeks. Shingles are on, grading & gravel, underground rough plumbing. Basement & garage concrete poured. HVAC is starting today. Basement framing goes this week! 🤘🏻

‼️NEW BUILD UPDATE‼️Floor joist, subfloor and main level walls went up in four days. We then waited for about two weeks ...
06/25/2025

‼️NEW BUILD UPDATE‼️

Floor joist, subfloor and main level walls went up in four days. We then waited for about two weeks for the trusses to be manufactured and also had a rain delay.

Most of the OSB is on, windows are tomorrow, shingles are Friday. Grading and gravel is next week. Basement and garage flat work the week of July 7.

Framing starts today!
05/29/2025

Framing starts today!

Address

Wentzville, MO
63385

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm
Saturday 7am - 5pm

Alerts

Be the first to know and let us send you an email when Invested Home Renovations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Invested Home Renovations:

Share