Drywall By Davis

Drywall By Davis Drywall hang and tape,carpentry, cabinetry, hardwood & lvp flooring, tile work, painting

More flooring, wallpaper border removal, drywall repair, remove popcorn and seal the ceiling for skim coat
01/02/2026

More flooring, wallpaper border removal, drywall repair, remove popcorn and seal the ceiling for skim coat

Walls painted, tv mounted to wall,skimming dining room ceiling, working thru hallway to dining and kitchen. Removing old...
12/27/2025

Walls painted, tv mounted to wall,skimming dining room ceiling, working thru hallway to dining and kitchen. Removing old flooring for the new.

Painting doors
12/14/2025

Painting doors

Living room ceiling primed and painted. Hallway primed. Flooring going down.
12/12/2025

Living room ceiling primed and painted. Hallway primed. Flooring going down.

Skimming the ceiling.
12/02/2025

Skimming the ceiling.

Beginning of 1st floor popcorn removal/ skim coat on ceiling. Will be doing new LVP and trim and a fresh coat of paint o...
12/01/2025

Beginning of 1st floor popcorn removal/ skim coat on ceiling. Will be doing new LVP and trim and a fresh coat of paint on the walls/ ceiling.

Punch list days are the busy days! Skylight had a couple touch ups, shower caulked, trim installed behind toilet, toilet...
11/15/2025

Punch list days are the busy days! Skylight had a couple touch ups, shower caulked, trim installed behind toilet, toilet installed, shower valving and shower head installed, shut offs for vanity installed, and cover plates made to cover old holes from vanity being raised. Little bit of list left for Monday then handing it back off to customer for painting the walls and vanity plus accents.

Busy day! Niche and foot rest installed,tile grouted, shower doors installed, kick panels made to cover the raising of t...
11/13/2025

Busy day! Niche and foot rest installed,tile grouted, shower doors installed, kick panels made to cover the raising of the vanity. Tomorrow will caulk and install valve for shower, toilet and necessary trim.

Ready to cut niche in tomorrow and install foot rest. Grouting the tile, and start installing the doors.
11/12/2025

Ready to cut niche in tomorrow and install foot rest. Grouting the tile, and start installing the doors.

Interesting start to this Onyx installation. Going vertical with the tile block.
11/12/2025

Interesting start to this Onyx installation. Going vertical with the tile block.

And then there was tile!
11/07/2025

And then there was tile!