08/05/2026

Gotta love zellige tile.

Customers shower had been leaking since day 1, 4 years ago. Unaware it was the shower she had replaced the bathroom floo...
08/05/2026

Customers shower had been leaking since day 1, 4 years ago. Unaware it was the shower she had replaced the bathroom floor and laundry room floor on the other side of the wall but was concerned about the shower pan.
The guy who did the previous shower put his nails to low in the liner and didn't have proper folds in the corners resulting in most of the sub-floor being damaged to the point of needing replacement.

I replaced the sub-flooring after beefing up the joists and walls which were not heavily damaged. Proceeded to prep the shower as normal and did provide a 24 hrs flood test for assurance.

Tile is 6x6 porcelain hand painted tiles for the shower floor with clean envelope cuts to line the tiles with the pitch of the mud bed.
12x24 porcelain wall tile, a marble floating bench seat and a custom shower niche.

The flooring will be next but customer wanted to hold off a bit before more construction work, understandable. While I was there another worker busted her waterline in her crawlspace.

Luckily the tile guy was there to fix it.

Customer was tired of her old cast iron tub and outdated tile so I replaced it all with a new acrylic shower tray and ne...
05/11/2026

Customer was tired of her old cast iron tub and outdated tile so I replaced it all with a new acrylic shower tray and new wavy subway style tile for the walls and new 12x12 porcelain for the flooring.

I disconnected and saved the vanity with countertop so I could re-install it after cleaning it up a bit.
Toilet fl**ge had a crack so I replaced that too while I was there before putting the toilet back in but never took pics of the toilet back in.

Zero entry with heating flooring accomplished.This one was a project.Starting by cutting down the joists in the shower t...
05/10/2026

Zero entry with heating flooring accomplished.
This one was a project.
Starting by cutting down the joists in the shower then adding new necessary support to all the framing by sistering new joists and support nailers.
The outside floor needed some leveler so I could get a slight pitch into the shower area being there is only a stationary panel on one side and no door.
I then closed up any gaps in the shower area and set my dry mud pack so everything had proper pitch and stayed flush with the main floor.
Next came schluter ditra heat throughout the entire floor and shower floor.
The shower was then covered with all schluter kerdi fabric and properly banded.
The tile is as you see, emerald green subway style tile in a 1/3 offset run vertically on the walls... pain in the butt.
12x24 flooring tile that changes to a penny tile shower floor.
Getting the tiles to line up was a challenge but I believe it came out pretty clean.

Was contracted for just the tile work and prep so unfortunately no pics of glass or shower fixtures.

Finally getting around to posting the final bathroom in this customers house. Finished away ago but slacking on social m...
05/10/2026

Finally getting around to posting the final bathroom in this customers house. Finished away ago but slacking on social media lately.

Same design as the others in the house with tile selection and cabinetry.

Address

Zebulon, NC
27597

Alerts

Be the first to know and let us send you an email when C.B. Tile & Marble LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to C.B. Tile & Marble LLC:

Shortcuts

Share