BM Architectural Design Studios

BM Architectural Design Studios Senior Architectural Technologist in association with Rchitek

M A L G A S - B R E E D E  R I V E RClient Requirements: New double storey nutec cabin on stilts / 3 Bedroom / Living ar...
04/12/2025

M A L G A S - B R E E D E R I V E R

Client Requirements: New double storey nutec cabin on stilts / 3 Bedroom / Living area / Kitchen / Bathroom / Covered Stoep with braai area / Ground Parking for vehicles and boat.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist
BM Architectural Design Studios

H E R M A N U S    P R O J E C TBuilding Plans Approved at Hermanus Overstrand Municipality!Client Requirements: New bou...
04/12/2025

H E R M A N U S P R O J E C T

Building Plans Approved at Hermanus Overstrand Municipality!

Client Requirements: New boundary wall / existing garage converted into new bedroom / Internal alterations.

Erf Size: 494.8 sqm
Zoning: Single Residential 1:Conventional Housing
Building Lines: 4.0m Street, 2.0m Common

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist
BM Architectural Design Studios

03/12/2025
W E L G E M O E D    P R O J E C TClient Requirements: Modernize entire front facade of the house / New Carport / 4 x Pe...
30/11/2025

W E L G E M O E D P R O J E C T

Client Requirements: Modernize entire front facade of the house / New Carport / 4 x Pergolas / New firepit boma area

Erf Size: 1613.75 sqm
Zoning: Single Residential 1:Conventional Housing
Building Lines: 4.5m Street, 3m Common

Stages of Approval:
1: Council
- Land-use application Section 42(b)
- Application for Permanent Departure in terms Section 42(b) of the MPBL to permit a carport & pergola on the 0m building line in lieu of 3m/4.5m building line.
2: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

Building Plans are submitted to council!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist

D U R B E L L    D U R B A N V I L L E    P R O J E C TClient Requirements: Existing garage converted to new second dwel...
30/11/2025

D U R B E L L D U R B A N V I L L E P R O J E C T

Client Requirements: Existing garage converted to new second dwelling / New carport

Erf Size: 1259.1 sqm
Zoning: Single Residential 1:Conventional Housing
Building Lines: 4.5m Street, 3m Common

Stages of Approval:
1: Council
- Land-use application Section 42(b)
- Application for Permanent Departure in terms Section 42(b) of the MPBL to permit a carport on the 0m building line in lieu of 3m building line. (Exceeding a width of 6.5m)
2: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

Building Plans Approved!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist

D E    O U D E    S P R U I T    P R O J E C TClient Requirements: New carport / 2 x Covered roof areas.Erf Size: 800 sq...
28/11/2025

D E O U D E S P R U I T P R O J E C T

Client Requirements: New carport / 2 x Covered roof areas.

Erf Size: 800 sqm
Zoning: Single Residential 1:Conventional Housing
Building Lines: 3.5m Street, 3m Common, 5m Garages

Stages of Approval:
1: Council
- Land-use application Section 42(b) carport / covered roof areas
2: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

Building Plans Approved!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist

P R O T E A    H E I G H T S    P R O J E C TClient Requirements: New second dwelling double storey apartment, third dwe...
28/11/2025

P R O T E A H E I G H T S P R O J E C T

Client Requirements: New second dwelling double storey apartment, third dwelling double storey apartment, braai to existing house.

Erf Size: 804 sqm
Zoning: Single Residential 1:Conventional Housing
Building Lines: 3.5m Street, 3m Common, 5m Garages

Stages of Approval:
1: Council
- Land-use application Section 42(b) 2nd Carriageway crossing
2: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

Building Plans Approved!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist

P R O T E A    H E I G H T S    P R O J E C TClient Requirements: New braai room, extra bedroom & en-suite, wash room, c...
28/11/2025

P R O T E A H E I G H T S P R O J E C T

Client Requirements: New braai room, extra bedroom & en-suite, wash room, carport.

Erf Size: 330.22 sqm
Zoning: General Residential 1:Group Housing
Building Lines: 3.0m Street, 0m Common

Stages of Approval:
1: Council
- Land-use application Section 42(j)
- Neighbours permissions required.
2: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

Building Plans Approved!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
063 581 2246
[email protected]
Senior Architectural Technologist

G R A A N E N D A L    V I L L A    C O R T A N A    R E T I R E M E N T    V I L L A G E    P R O J E C TClient Require...
27/11/2025

G R A A N E N D A L V I L L A C O R T A N A R E T I R E M E N T V I L L A G E P R O J E C T

Client Requirements: New carport & updated building plans.

Stages of Approval:
1: Estate Home Owners Approval
2: Council
- Land-use application Section 42(j)
- Neighbours permissions required.
3: Council
- Building Development Management application
- Application Form required.
- Power of Attorney required.
- Structural Engineer required.
- Title Deed required.
- SG Diagram required.

ERF Size: 326 sqm
Zoning: General Residential 1:Group Housing
Building Lines: 4.7m Street, 3m Common (Estate Guidelines)

Building Plans Approved!

Always contact the building inspector for an appointment to start the building works! Compulsory inspections must be conducted by the building inspector to ensure that the building works complies with the approved plan.

Brandon Mongie
078 604 9798
[email protected]
Senior Architectural Technologist

Address

Brackenfell South, Sonkring
Cape Town
7560

Alerts

Be the first to know and let us send you an email when BM Architectural Design Studios posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share