At First Move Construction, we meticulously manage each phase of construction in a systematic manner, as outlined below:
🔹1. Site Clearance and Ground Leveling
🔹2. Pe***ng and Setting Out
3. Trench Excavation
🔹4. Foundation Reinforcement and Shuttering
🔹5. Footing Pouring and Termite Treatment
🔹6. Brickwork Under DPC Foundation Box Construction*
🔹7. Compaction and Backfilling
🔹8. Underground Electrical Tubing and Plumbing
🔹9. Slab Casting
🔹10. Structural Brickwork to Door Level
🔹11. Ring Beam Level Shuttering
🔹12. Steel Fixing, Cutting, and Bending
🔹13. Ring Beam Concrete Casting and Lintels
🔹14. Roofing
🔹15. Window Fabrication and Installation
🔹16. Tubing and Wiring
🔹17. Plastering and Reviews
🔹18. Ceilings
🔹19. Skimming
🔹20. Tiling
🔹21. Accessories Fittings Installation
🔹22. Paving
🔹23. Painting and Varnishing
This structured approach ensures that all aspects of the construction process are executed with precision and professionalism