Our team pulled out all the stops on this one.
With a few inspection delays and 7 different concrete pours. We got this project wrapped up in 24 days. 800sq ft of pool, 4000sq ft sidewalk, 150ft of wall. 25 loads of aggregate. Springbank calgary.