Professional / Investor updateFire insulation update - 11-bed HMO  Superglass fire insulation now being pumped into the ...
17/06/2026

Professional / Investor update
Fire insulation update - 11-bed HMO
Superglass fire insulation now being pumped into the studwork. Blown insulation gives full cavity fill with zero cold spots or gaps - key for both fire rating + acoustic performance between rooms.

You can see the Knauf Perimeter Plus membrane going up first to contain it. Proper PPE, proper process, proper fill density.

This stage ticks Building Regs Part B + Part E. Next up: dry lining to close it in.

Compliance isn’t an afterthought on this job.

Dry lining update - 11-bed HMO  Excellent work on the dry lining this week. Boards are up throughout with all joints tap...
17/06/2026

Dry lining update - 11-bed HMO
Excellent work on the dry lining this week. Boards are up throughout with all joints taped and prepped ready for skim. You can see the attention to detail on the vaulted ceiling angles and window reveals - clean cuts, tight joints, no gaps.

Scaffold Tower in place for the high ceiling, and British Gypsum MultiFinish stacked ready for the plasterers. This prep work is what gives you a clean, crack-free finish and keeps BC happy on acoustic/fire standards.

Site is tidy, work is tidy, and we’re set for first fix to be closed in. Another solid step forward.

HMO 11-bed update  Solid progress on site this week. Completed: All structural works are now finished and signed off by ...
16/06/2026

HMO 11-bed update
Solid progress on site this week.

Completed: All structural works are now finished and signed off by Building Control. That includes steels, lintels, and the 2-storey rear extension shell. Having BC sign-off at this stage de-risks the project and keeps us on track for completion.

In progress: Internal drainage system is being finished off with floor repairs where the new runs come through. Team are also busy with the prep work - boarding out, sealing, and getting areas ready for dry lining and insulation. Not the most exciting stage, but it’s what makes the build airtight, warm, and compliant.

Next up: First fix electrics + plumbing, then dry lining and fire door installs. Once that’s in, the 11 rooms will start to look like actual bedrooms rather than a building site.

Nice job completed this week by our team •  Open plan with island + breakfast bar •  Light oak cabinets + quartz worktop...
16/06/2026

Nice job completed this week by our team

• Open plan with island + breakfast bar
• Light oak cabinets + quartz worktops.
• Full-height sliding doors opening to garden.
• Roof lantern/skylight for extra light.
• Wood flooring to match the extension.

Great look to complement the rest of the property.

Nothing too glamorous, but essential works for our property maintenance team.
11/06/2026

Nothing too glamorous, but essential works for our property maintenance team.

BORDON Project - Final Push 🚀We’re close to the finish line on this one.Full steam ahead with the internal fit out: •  1...
10/06/2026

BORDON Project - Final Push 🚀

We’re close to the finish line on this one.

Full steam ahead with the internal fit out:
• 1st fix electrical + plumbing ✅ Complete
• Insulation ✅ Done
• Plasterboard ✅ Complete
• 2nd fix 🔜 Close

Team have kept the program tight and standards high. The vaulted ceilings are really coming into their own now the boarding’s in.

Target: 3 weeks to completion before handover. Great project, great client.

SecondFix VaultedCeiling HandoverSoon

Internal Decorations - Project Update 🖌️Phase 1 complete ✅ The dining area was finished last year and we received a glow...
10/06/2026

Internal Decorations - Project Update 🖌️

Phase 1 complete ✅ The dining area was finished last year and we received a glowing report from the client. That set the standard for the rest of the project.

We’ve recently carried out a full refurb of their silverware display cabinet - restoring it back to its best.

Now the team are making good headway on the corridors. Clean prep, sharp lines, and the same attention to detail throughout.

Consistency and client trust built project by project.

QualityFinish

Drainage Install 🚜💧We were tasked to put in this chamber to upgrade a sewage area for a local farm. Battle with unseason...
05/06/2026

Drainage Install 🚜💧

We were tasked to put in this chamber to upgrade a sewage area for a local farm.

Battle with unseasoned rain made it tough, but the team got stuck in. Tight work, proper install, and this will no doubt improve waste management on site. Another essential job done right, whatever the weather.

AllWeathers OurspaceTeam

Apartment Makeover 🎨🏠Our decorating team have been busy undertaking full decorations on a number of properties for a reg...
05/06/2026

Apartment Makeover 🎨🏠

Our decorating team have been busy undertaking full decorations on a number of properties for a regular customer.

Standard colours, but great standard of finish. Clean lines, crisp edges, job done right. That’s what keeps them coming back.

OurspaceTeam

Project BORDON Update 📍🏗️Internals are on program. Insulation fitted and ready for boarding + plastering on that beautif...
05/06/2026

Project BORDON Update 📍🏗️

Internals are on program. Insulation fitted and ready for boarding + plastering on that beautiful vaulted ceiling. Big impact coming there.

Our screeders have also completed all areas required. Floors prepped and ready for the next stage.

Momentum is good 👌

VaultedCeiling ConstructionUpdate

Address

Rowlands Castle

Alerts

Be the first to know and let us send you an email when Ourspace posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ourspace:

Share