05/09/2026
A bit of remedial work on this utility/storage room after some previous work someone else had completed left the client wanting to change certain things.
The sections around the utility openings had originally been built in MDF, but with the amount of moisture expected in the room the client wanted those areas removed and replaced. I stripped the MDF off and plasterboard using edge stops around the openings to neatly finish the cut board edges before plastering everything in.
We also removed the existing step/boxing as it wasnβt really fit for purpose and left no clean way of finishing the adjoining wall properly the reveals were not dabbed correctly and all over not leaving equal square edges around the door which made it a pain.
A few walls were then plastered along with the garage side, with everything properly trowelled and finished throughout.
It might only be a utility/storage area+ garage side but the standard stays the same. Two coats and a few trowels.. all corners left neat as they should be no splashes on other surfaces. If my name is going on it, I want it finished properly β whether itβs on show or not. π
DM Plastering & Rendering Services LTD
07709888039
Making your house a home.