12/09/2026
Another poured floor insulation job complete, this time at Kileen Castle grounds.
Our energystore TLA insulation was poured straight over the subfloor using our mobile screed factory, set to exact depth with laser levelling. No boards to cut, no fixed joints, and 0% waste to landfill, with an A2 fire rating built in.
The result is a smooth, cured floor ready for the next stage, no gaps, no uneven patches to fix later.
Thinking about insulation for your own build? We offer free site surveys and quotes.
📞 087 997 2159 | 📧 [email protected] | precisionfloorscreed.ie