06/05/2026
🏡 Moving Right Along: Part 2! 🔨
We are back with the next chapter of our multi-part progress series on this beautiful custom build! If you caught our last post, you saw the foundation and the very beginning of the framing. Now, things are moving fast!
Swipe through ➡️ Photos 11–20 ➡️ to see the latest updates.
In this round of photos, you can see the home really starting to take its true shape. We’ve wrapped up the heavy framing, dried it in with weather protection sheathing, installed the roof lines, and got the windows in place! You can also catch a glimpse of the exterior trim work, siding starting to go up, and the scaffolding required to safely reach those gorgeous high mountain peaks.
The transition from a skeleton frame to a fully enclosed house is always one of our favorite stages.
We still have plenty more to show you as we move closer to the finish line, so keep an eye out for Part 3!
***