11/11/2026
Your renovation didn't slip because the crew was slow. It slipped at 10 AM — when the building finally let them start.
NYC buildings run renovation schedules as much as contractors do: short work windows, building holidays that change from one address to the next, one elevator for everybody, trades that have to run in exact order, last-minute changes, whatever's hiding inside the walls, and appliances that take their time arriving.
None of it is a mystery if it's in the plan from day one. That's how we schedule — the building's clock first, then ours.
Planning a reno? WhatsApp link in bio — we'll give you a date built on the real calendar, not the hopeful one.