06/03/2026
And we're back ! Decided to take a little vacation in ground level world to knock out this nice cedar 192ft² rebuild. As you remember, last time we were here the deck had to be pulled off the house to replace: 32' of sill and double rim joist in order to sister floor joist ends, replace subfloor, swap out the door, and install new flooring (water sure can be mean).
Hanging stairs and railings tomorrow, finishing up door trim and siding Friday. Then on to the next! As always, feel free to reach out for your home renovation needs - one call does it all!