D&C Roughcasting

D&C Roughcasting Professional and quality rough casting and plastering service. We take pride in our work and every
(1)

Next job 4/5week project Full house will get stucco net Wet cast finish Scratch render bands Can’t wait to get started  ...
13/05/2026

Next job

4/5week project
Full house will get stucco net
Wet cast finish
Scratch render bands
Can’t wait to get started

08/05/2026

Now taking bookings for September 2026

Don’t miss out to get booked in

🏑🏑🏑🏑🏑



&c roughcasting

Scottish water plant Job complete Building got fungicide washSbr glue Basecoat 110 sika with mesh Topcoat exposed Polar ...
03/05/2026

Scottish water plant
Job complete

Building got fungicide wash
Sbr glue
Basecoat 110 sika with mesh
Topcoat exposed
Polar white chips

Job in progress Full strip off old render removed back to brick  One day to strip of 70meter the team never fail  πŸ’ͺπŸ’ͺπŸ’ͺπŸ’ͺπŸ’ͺA...
23/03/2026

Job in progress

Full strip off old render removed back to brick

One day to strip of 70meter the team never fail
πŸ’ͺπŸ’ͺπŸ’ͺπŸ’ͺπŸ’ͺ

Already to get base coat mesh
Ready for ecorendofficial
Scotch stone monocouche

Job confirmed when roughcasting over painted houses make sure the job gets done  right Doing two test patches over paint...
13/03/2026

Job confirmed when roughcasting over painted houses make sure the job gets done right

Doing two test patches over paint to make sure it adheres and it’s not oil based paint

Apply rendagrip
Adhesive coat mesh

3 jobs started this week due to weather One was a painted surface job had to get rendagrip due to it being painted Secon...
12/03/2026

3 jobs started this week due to weather

One was a painted surface job had to get rendagrip due to it being painted

Second was small wall stripped back to brick ready to get high polymer base coat and mesh

Garage stripped back to brick ready for high
Polymer base mesh

Job complete Old roughcast stripped back to brick Building all washed downSbr applied Basecoat 110Topcoat exposed white ...
23/02/2026

Job complete

Old roughcast stripped back to brick
Building all washed down
Sbr applied
Basecoat 110
Topcoat exposed white
Pembroke spar chips

Don’t miss out on roof and roughcast packages for 2026
13/02/2026

Don’t miss out on roof and roughcast packages for 2026

Job in progress Full strip off underway U want the best get booked in for 2026 All work comes with a 10year guarantee
30/01/2026

Job in progress

Full strip off underway

U want the best get booked in for 2026
All work comes with a 10year guarantee

Next job  double block Full strip off back to brick Time to get the πŸ’ͺ  πŸ’ͺ  πŸ’ͺ out
28/01/2026

Next job double block

Full strip off back to brick

Time to get the πŸ’ͺ πŸ’ͺ πŸ’ͺ out

Job complete House is finished with 90/10 Tudor Smooth render at base band Sika 110 basecoatSika topcoat exposed white A...
28/01/2026

Job complete

House is finished with 90/10 Tudor
Smooth render at base band
Sika 110 basecoat
Sika topcoat exposed white
All cills painted anthracite

New fascia soffit gutters downpipes
Installed

Address

Glasgow

Alerts

Be the first to know and let us send you an email when D&C Roughcasting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to D&C Roughcasting:

Share