11/26/2025
A beautiful finish on the eve of Thanksgiving. The Viessmann CU3A High Mass boiler, matched with a 79-gallon storage tank, provides an endless supply of hot water. It's nice to have a blank canvas. For those curious, the grand total required is approximately 100 man-hours, excluding additional resources needed for the tear-out, new wall, and epoxy floor.